Bitmain Antminer S23e Hyd 2U (865Th/s)

SHA-256 BTC (Bitcoin) Hydro icon Hydro cooling
4.9 (10 reviews)
⚡ 865T 8650W 📊 10.00 J/Th 🔋 PSU Included 🚚 Free Shipping
$8,217.50
$8,650.00
≈ 0.10503398 BTC
💳 Credit Card · ₿ BTC 🚚 Est. shipping: September 5 - September 8, 2026
📦 In stock: 1

Description

Bitmain’s Antminer S23e Hyd 2U is a hydro-cooled SHA-256 miner delivering 865 Th/s at 8650W. Its 2U rack format and 50 dB noise profile support high-density data center deployment. Released in April 2026, it is designed for large Bitcoin mining operations.

Specifications

ManufacturerBitmain
ModelAntminer S23e Hyd 2U (865Th)
Also known asAntminer S23e U2H
ReleaseApr 2026
Size600 x 483 x 86mm
Noise level50dB
Power8650W
Rack format2U
InterfaceEthernet
Temperature5 - 45 °C
Humidity5 - 95 %

Profitability

DailyMonthlyYearly
Income $34.39
0.000440 BTC
$1,031.56
0.013193 BTC
$12,550.62
0.160519 BTC
Electricity -$10.38 -$311.40 -$3,788.70
Profit $24.01 $720.16 $8,761.92
Profit 69.81% Electricity 30.19%
ROI ~239 days
ROI ~343 days

Based on $0.05/kWh. Data refreshes every 24h.
ROI (Return on Investment) = miner price ÷ earnings. Green = without electricity cost. Red = after deducting electricity.

Frequently Asked Questions

No. Bitmain Antminer S23e Hyd 2U (865Th/s) currently generates ~$24.01/day at $0.05/kWh. Profitability changes with network difficulty, hashrate, block reward, and SHA-256 price.

Bitmain Antminer S23e Hyd 2U (865Th/s) delivers 865T on SHA-256, drawing 8650W.

Bitmain Antminer S23e Hyd 2U (865Th/s) consumes 8650W per hour (~$10.38/day at $0.05/kWh).

Electricity is the main operating cost. For Bitmain Antminer S23e Hyd 2U (865Th/s), it's $10.38/day — if your rate is higher, profit drops; if lower, profit increases.

3–5 years with proper maintenance. Lifespan depends on operating temperature, humidity, dust levels, and power stability.

Customer Reviews

4.9
★★★★★
10 reviews
5 Stars
70%
4 Stars
10%
3 Stars
20%
2 Stars
0%
1 Stars
0%
SP
Samir Patel
★★★★★
Jul 12, 2026

Game-changing efficiency. My electricity costs dropped 25% while maintaining the same hashrate. The numbers don't lie - this is the one.

PD
Pierre Dubois
★★★★★
Jul 10, 2026

Seven months in and I've already ordered three more. The first one proved itself beyond doubt. These miners are the backbone of my operation.

VE
Valeria Esposito
★★★★★
Jul 03, 2026

Beat my ROI estimate by two months. The efficiency was even better than I calculated. Now it's pure profit and I'm planning my next purchase.

DN
Deepak Nair
★★★★★
Jul 03, 2026

This is the one you want. Stop researching and start mining. The efficiency numbers speak for themselves and the reliability backs it up.

AK
Ayesha Khan
★★★★☆
Jun 11, 2026

Very satisfied with the purchase. The miner arrived quickly, was easy to set up, and has been hashing away ever since. No nonsense.

NL
Niklas Lindqvist
★★★★★
Jun 11, 2026

The included quick start guide is actually useful. Rare in this industry. Had me mining in under 15 minutes with optimal pool settings.

NOTE

  • Incorrect input voltage can cause damage to the miner.
  • Use two AC input wires, each with a 16-amp rating.
  • Operation is recommended at altitudes below 2000 meters.

Purchasing Guidelines

  • The listed retail price does not include customs duties or applicable taxes.
  • Orders cannot be canceled or refunded once submitted.
  • Product images are for reference purposes only; the actual shipped product will prevail.

Shipping Details

  • Products will be shipped from China.
  • Fully paid orders will be processed on a first-come, first-served basis.
  • Customers bear responsibility for customs delays or issues.

Warranty

  • 180-day warranty period starts from the shipping date.
  • Valid only for the original purchaser.
  • We are not responsible for damages due to non-compliance with instructions.